| Charter
on Corporate Responsibility for Environmental Protection Zinc
Zinc
Industry
- Meeting
SO2 emission limit (2 kg / tonne of H2SO4 produced), 50 mg
/ Nm3 of acid mist by Dec 2006. Action plan to be submitted
by July 2003.
- SO2
Emissions monitoring – Installation / Proper operation,
maintenance and calibration of continuous SO2 monitoring system
by 30th September 2003
- Solid
and Hazardous Waste disposal: Construction of secured landfill
for disposal of hazardous waste such as Jerosite cake, ETP
cake and spent catalyst as per CPCB guidelines by 30th June,
2003.
- Wastewater
treatment and disposal: To achieve Zero discharge through
100% recycle/reuse of treated wastewater by 31st December,
2004.
- House
Keeping: To reduce the generation of fugitive dust from vehicle
movement and improve overall house keeping – by 31st
December, 2003
- Green
Belt: To develop canopy based green belt around the periphery
of plant and township as per CPCB guidelines
|